Photo Album
CLASSIC JUPITER 2--- Built From Scratch
| Home | 24 inch Jupiter 2 | History/Background | History/Background (cont'd) | Photo Album | Photo Album (cont'd) | Instructions Page | Instructions (con't) | Tips and Troubleshooting | Related Links | Contact Me | Completion of lower deck frame. | Page 4 | Page 8 | UPPER DECK ASSEMBLY PAGE 9 | Page 10 | Page 11

Here's the area I've been working in.
As you can see, the ship is 95 percent complete. I still have a few minor details to finish on the inside.

Man playing guitar; Actual size=240 pixels wide

In the picture above is the front view. In the picture below is the upper deck in it's framing stage.

8.gif

j2stranded.gif

In the picture above is the viewport on the lower deck. the shutters can slide open or closed.
In the picture to the left is the intire ship in it's
framimg stage. If you look closely in the lower right side
of the picture you can see the portside landing gear (retracted).

In the picture below the roof is being remooved so that
upper deck can viewed.

j2stranded.gif